Maritime Survey Australia recently completed an initial survey on the Dalengi, a state of the art high- speed catamaran owned and operated by Queensland based Island Transfers.
Built by Alumarine, The Dalengi will be used as a fast-cat water-taxi service between Queensland’s Whitsunday Islands. Naval Architect, Damien Smith’s design includes asymmetrical, wave piercing technology which along with its twin hull design offers a smooth and stable ride.
Maritime Survey Australia worked with the builder and designer to ensure the vessel’s compliance with relevant survey standards for use as a commercial vessel.
This included the following:
Design Approval Phase – Approval of design drawings for the vessel against design standards.
Construction Phase – Inspection during the vessel’s construction against the approved design.
Commissioning Phase – Testing and trialling the vessel and its systems to ensure its functions as designed and meets applicable standards including safety systems, type of safety equipment, assessment of intact and damage stability, and reliability of on-board machinery.

Building or buying a new vessel or changing class?
Contact Maritime Survey Australia today to discuss your project requirements.
An Initial Survey is the inspection of a vessel, generally for the first time, to assess and approve its design and construction against the requirements of the NSCV or other standards that apply under Marine Order 503 (Certificates of Survey National Law) 2013.
Our initial marine surveyors will liaise with the vessel builder and designer to check compliance against the relevant survey standards to minimise delays, or prevent any last-minute headaches, to ensure a vessel is able to comply as a Domestic Commercial Vessel.
An initial survey comprises three phases:
Design Approval Phase – This includes the approval of design drawings for a new vessel, or assessment of an existing vessel structure, against design standards.
Construction Phase – This is the program of inspection during a vessel’s construction against the approved design. The inspections vary for each vessel and includes the inspection of welds, fibreglass laminate lay up, buoyancy foam, materials and equipment, and surveys during the construction of the vessel.
Commissioning Phase – The process by which a vessel and its systems are trialled and tested to ensure the vessel functions as designed and meets applicable standards. This includes trials and tests of the vessel and systems essential to safety, type of safety equipment, assessment of intact and damage stability, and reliability of on-board machinery.